Home | Inquiry | Contact Us | Site map | Login
Projects Categories
Solar Power Plant
Cement Plant
Steel Plant
Power Plant
Sewage Treatment Plant
Packaging Plant
Institutional Work
Gas Compressor Stations
Industrial Projects
Infrastructure Work
Food Industry
Residential & Commercial Work
Earth Work
Inquiry Form
 
 
 
 
 
 
 
CAPTCHA Image
 
 
 
Photo Gallery
 
Solar Training at GERMI_Group Pic.
College Hostel Spiral Stair Case.
Cement Project under Construction (45).
Parking (1).
College Building Main Campus Waiting Room.
Inside View of Silo.
Cement Silo Footing.
Industrial Administration Building Corridor.
Sky Light in Main Campus Building.
Earth Work.
Earth Work (5).
Industrial Buildings Internal Shutters.
Solar Plant CSS Foundation.
Steel Plant Construction 3.
Cement Plant 1.
RCC Silo Slip Form.
Auditorium Stage.
College Campus.
Cement Project under Construction (48).
Cement Project under Construction (18).
Cement Project under Construction (19).
Earth Work (6).
Laboratory Class Room.
RCC Silo Stagging work.
Solar Plant Finished Pile Foundations (2).
Cement Plant.
Preheater Tower Column Foundation.
Cement Project under Construction (14).
Solar Plant (3).
Cement Project under Construction (27).
Solar Plant Slab Foundations for PV Modules.
Cement Project under Construction (32).
Control Room.
Land Scape.
Industrial Building Interior (4).
Machinery 6 (1).
Solar Plant.
Concrete activity for Control Building at Solar Plant.
Air Port Hanger Building.
Air Port Hanger Floor 2.
College Library (2).
Cement Project under Construction (25).
Auditorium Stage (2).
Cement Project under Construction (35).
Earth Work (7).
Industrial Building Interior (6).
Solar Plant Finished Pile Foundations (4).
Fencing Work at Solar Plant.
PreHeater Tower Foundation Reinforcement Work.
Bird's Eye View of Mehsana Hangar.
Canteen (3).
Workshop Building.
Control Room and Pipe Rack.
Preheater Tower Column Concreting.
Cement Plant (3).
Clinker Stockpile.
High Rise Building Foundation.
Industrial Building Interior (11).
Cement Project under Construction (1).
College Building Main Campus Interior Lab 3.
Earth Work (4).
Factory Building Vaccum Dewatered Trimix Floor.
College Building Main Campus Interior Lab 4.
Oxygen and Spongeyarn Plant.
College Building Workshop 2.
Effluent Treatment Plant (2).
Solar Plant Finished Slab Foundations (2).
Water Network Junction.
Paint Booth Industruial Unit.
College Building Main Campus Class Room 1.
Cement Project under Construction (29).
Cement Project under Construction (39).
Industrial Factory under construction.
Factory Building GSB and Earth Work.
Oxygen Plant.
FoothPath Sample.
Solar Plant Finished Slab Foundations.
Factory Shed and Road Work.
Industrial Heavy Flooring.
College Building Main Campus (2).
Cement Project under Construction (30).
Industrial Building Interior (7).
RCC Silo Slip Form Shuttering.
RCC Open and Shaded Stack Yard (2).
Industrial Building Interior (10).
Solar Plant Erected PV Panels on Structures.
Cement Project under Construction (34).
Solar Plant Pile Foundation under Construction (2).
College Building Laboratory Unit.
Solar Plant Switch Yard Foundation.
Cement Silo and Cement Mill House.
Solar Plant Pile Foundations.
Steel Plant.
Cement Project under Construction (26).
Cement Project under Construction (47).
RCC Open Stack Yard.
College Building Laboratory Unit 3.
Cement Project under Construction (36).
Cement Silo Foundation.
Air Port RCC Apron 1.
Cement Project under Construction (44).
Cement Project under Construction (5).
Heavy Slab Stagging and Shuttering Work.
Bike Assemble Buildin and Paint Booth.
Heavy Foundation Concreting Activity.
Cement Mill House and Packing Plant.
Industrial Building Interior (1).
Muhurt At Solar Plant.
Machinery (2).
College Campus Land Scape.
Effluent Treatment Plant (4).
Silo Fabrication Work.
College Building Main Campus 2.
Solar Plant Pile Foundations Under Construction.
RCC Silo Slab Reinforcement.
College Building Main Campus Interior Lab.
Air Port RCC Apron 3.
Cement Project under Construction (15).
Gantry Girder and Columns.
Air Port Hanger RCC Floor.
Efluent Treatment Plant.
PreHeater Tower Footing.
Industy Power Unit.
College Campus (2).
Air Strip Runway.
RCC Silo Footing.
Industrial Buiilding Heavy Duty Floor.
Auditorium (2).
RCC Silo Slab _View_Fish Eye Lense.
Residential Units.
High Rise Building Foundation Concreting Activity (3).
Factory Entrance (1).
Solar Plant Concreting Work (2).
Cement Project under Construction (9).
Cement Project under Construction (40).
Solar Plant False Ceiling Work.
PreHeater Tower Foundation Shuttering work.
College Building Main Campus Interior Fire Brick Work.
Steel Plant Construction 2.
Stagging Material.
Machinery 6 (3).
Solar Plant False Flooring and Ceiling Work.
Girls Hostel and Water Tank.
RCC Silo Initial Stage.
Cement Project under Construction (43).
Solar Plant Concreting Work.
Kiln Pier and PreHeater Tower.
PreHeater Tower Footing 2.
Sewage Treatment Plant.
PreHeater Tower Footing 1.
Effluent Treatment Plant (1).
First Work.
Machinery 3.
College Building Main Campus 1.
College Main Gate 2.
High Rise Building Foundation Concreting Activity.
Steel Plant Construction 1.
College Library.
Cement Project under Construction (28).
Cement Project under Construction (24).
Airport Hanger Apron Runway.
Canteen (1).
RCC Silo Base Slab.
College Hostel Building.
PreHeater Tower Column Foundations.
Machinery 6 (2).
Machinery 7.
Strom Drain HT Line Water Line Sewerage Line and Other Utilities.
College Building Workshop Shed.
Air Port Hanger Back View.
RCC Open and Shaded Stack Yard (3).
Food Factory Building Flooring Work.
Solar Plant Under Construction.
Cement Project under Construction (22).
College Display Unit 2.
Earth Work (8).
Steel Yard at Solar Plant.
Machinery 2.
Steel Plant Construction 4.
College Building Main Campus Spiral Stair Exposed.
Hostel Buildings Over Head Water Tank.
Food Factory Building Interior.
Solar Panel Installation Training At GERMI.
RCC Silo Bottom Slab Reinforcement Work.
Air Port RCC Taxi Lane.
Instititional Laboratory Building.
Solar Plant Modules.
CCR Building.
Solar Plant Pile Foundation Under Construction.
Cement Project under Construction (37).
Industy Public Toilet (2).
RCC Silo and Preheater Tower.
Auditorium.
Cement Project under Construction (21).
Cement Silo Wall.
Industrial Building Interior.
PreStressed High Rise Building Foundation.
Cement Project under Construction (7).
Air Port Apron 5.
Weigh Bridge under Silo.
Earth Work (2).
PreHeater Tower Foundations.
Industrial Building GSB and Earth Work.
Sky Light in Boy's Hostel.
Food Insutry Factory Building.
Solar Plant Slab Foundations (2).
Earth Work (1).
Solar Plant Taking Shape (1).
Solar Module Slab Foundation 2.
Gujarat NRE Cock Open Stakyard Flooring.
Air Port RCC Apron 2.
Coal Stake Yard Flooring.
Fly Ash Silo Bottom Slab and Columns.
Prestressed High Rise Building Foundation (2).
Industrial Admin Building Corridor.
Canteen (5).
Solar Plant CSS Foundations.
Cement Project under Construction (41).
Solar Plant Finished Pile Foundation.
Solar Plant False Flooring.
PreHeater Tower Foundation Reinforcement Work (2).
Industrial Building Interior (8).
Cement Mill Column Foundation.
Solar Module Slab Foundation 1.
ZZZ.
Industrial Building Interior (3).
College Building Laboratory Unit 1.
Work Shop Shade Under Construction.
Computer Laboratory.
Gym.
Solar Plant (2).
Solar Plant Control Room Slab Concreting.
Solar Plant Full View.
Cement Plant (2).
PreHeater Tower RCC Silo.
Cement Project under Construction (6).
College Building Hanging Plane.
Road Work Storm Water Drain and Street Light Foundations.
Earth Work (3).
Machinery 99.
Industrial Building Internal Corridor.
Cement Project under Construction (23).
Plant and Machinery 1.
College Building Main Campus and Lab Building.
Solar Plant Module Slab Type Foundation.
College Canteen.
Solar Plant Slab Foundations (1).
College Building Main Campus Interior Lab 2.
Slipform Shuttering.
Cement Project under Construction (10).
College Display Unit 1.
Work Shop Building.
Solar Plant Control Building Block Masonary.
Solar Plant Structure and Module Installation.
College Building Laboratory Unit 4.
High Rise Building Foundation Concreting Activity (2).
Food Factory Building Work.
Food Factory Building.
Industy Public Toilet.
RCC Silo Starter Work.
College Building Workshop.
College Building Main Campus Interior 5.
Cement Packing Plant.
Cement Project under Construction (3).
Cement Plant (4).
College Building Workshop and display unit.
Pile Foundation for Solar Power Plant.
Cement Project under Construction (4).
Air Port Apron (Parking).
Pre Stressed High Rise Building Foundation PCC and Reinforcement Work.
Cement Project under Construction (46).
Road Work _GSB.
PreHeater Tower.
College Main Gate.
PreHeater Tower and RCC Silo.
Solar Plant Control Room RCC Work.
Industrial Building Heavy Duty Vaccume Dewatered Trimix Factory Floor.
Industrial RCC Tank.
Cement Project under Construction (16).
Silo Bottom Slab and Slip Form Work.
Solar Plant Control Room.
Cement Project under Construction (2).
College Building Main Campus Back Yard and Display Unit.
College Main Gate and Landscape Circle.
Food Factory Flooring Work.
Solar Plant Fencing Work.
Cement Project under Construction (17).
Solar Plant Module Slab Foundation.
Solar Plant Structure and Module Installation 1.
Kiln Pier Foundation.
Institutional Building Plaster Work.
Solar Plant (1).
Canteen (2).
Mithapur Solar Plant.
Industrial Building (2).
Deshuttering of High Rise Heavy Slab.
Air Port Apron 6.
Factory Building Gantry Girder Columns and Pockets.
College Building Main Campus Side View.
Industry building internal corridor.
Solar Plant Slab Foundation Under Construction.
CCR Building and PreHeater Tower.
Plant And Machinery.
College Main Gate 1.
Cement Silo Under Construction.
College Building Main Campus Class Room 2.
Cement Project under Construction (49).
Hexagon Pattern.
Kiln Pier Foundation (2).
College Building Workshop and Display Unit 1.
College Campus Water Body.
Heavy Foundation Reinforcement Work.
Cement Project under Construction (38).
Slip form Shuttering.
College Main Gate Parking and Landscape.
Machinery.
College Night Life.
Solar Plant Slab Foundations.
Road Work_Utility.
Canteen (4).
Cement Project under Construction (42).
Fencing Work at solar plant (2).
Surveying Instruments.
Solar Plant RCC Slab Foundations.
College Builing.
Hydro Test Plant (2).
Parking (2).
RCC Kiln Pier.
College Building Main Campus Under Construction.
Air Port Hanger.
Industrial Building.
PreHeater Tower Foundation Work.
GSB Work.
Solar Plant Slab Foundations (3).
College Building Main Campus.
PreHeater Tower RCC Silo Initial Stages.
Pile Drilling and Concerting Work at Solar Plant.
Silo Pumping_Concrete Activity.
Road Work Sample.
Solar Plant Under Construction Full View.
College Building Main Campus Interior.
Making of Shuttering.
College Building Main Campus Skyline.
Cement Project under Construction (31).
Solar Plant Finished Pile Foundations.
Solar Plant Slab Foundations (4).
Solar Plant Foundations for PV Panels.
Preheater Raft Footing.
Solar plant Finished Pile foundations (3).
Air Port RCC Apron 4.
Solar Plant Taking Shape (2).
Factory Entrance (2).
Solar Plant Reinforcement Cages.
Flyash Silo Bottom Slab.
High Rise Buildng Top Slab Stagging and Shuttering.
Solar Plant CSS Foundation and Control Room.
Industrial Shed Work.
Roof Top Solar System At GERMI Training.
 
 
 
  Home  |  About Us  |  Projects |  Services |  Contact Us  |  B-Con Profile  |  Inquiry  |  Photo Gallery  |  Sitemap  |  Login Designed By : Shah Net
  Bhagyashree Construction © 2011 All Rights Reserved